ODOT Schedules Closure of Winchester Pike Bridge Over U.S. 33 Through Early 2028
The Ohio Department of Transportation plans a multi-year rehabilitation of the 1963 bridge, establishing detours along James and Refugee roads.
The Winchester Pike overpass bridge over U.S. Route 33 in Columbus is scheduled to close for more than a year to undergo major rehabilitation, according to the Ohio Department of Transportation. State transportation records schedule a closure starting Friday, Nov. 20, 2026, with the roadway slated to remain shut through early 2028.
A WBNS 10TV traffic report displays a corridor closure map for the Winchester Pike overpass bridge over U.S. Route 33 in southeast Columbus.
Credit: WBNS-TV (10TV) / Yahoo News Image source
During the closure, crews will make major repairs to extend the bridge's lifespan and improve safety, ODOT announced. The project includes replacing the bridge's driving surface, upgrading components that support the structure, and strengthening the bridge piers. According to ODOT, the bridge was originally constructed in 1963 and last received minor rehabilitation work in 1993.
To navigate the closure, ODOT established official detour routes for drivers traveling through the southeast Columbus corridor. Northbound drivers are directed along a detour following Winchester Pike to James Road, then connecting to westbound Interstate 70 toward Livingston Avenue and U.S. 33. Southbound traffic is advised to detour from U.S. 33 to State Route 104 and Refugee Road before returning to Winchester Pike.
State work-zone records indicate that the closure spans a 0.581-mile roadway segment with all lanes closed to vehicle traffic. Traffic feed entries record the scheduled start on Nov. 20, 2026, while classifying the start date as unverified without real-time physical confirmation. The Winchester Pike entry lists an end date of Jan. 15, 2028, with end verification marked 'No'.
Video Watch video 0:39
How we know this
The sources and records behind this story, with the facts they support.
https://www.yahoo.com/news/us/articles/section-winchester-pike-close-more-171902001.html
Supporting evidence (6)
The Winchester Pike overpass bridge over U.S. Route 33 in Columbus is scheduled to close for more than a year to undergo major rehabilitation, according to the Ohio Department of Transportation.
Read supporting passage
A portion of Winchester Pike will soon close for more than a year, impacting Columbus travel.Winchester Pike over U.S. 33 will close through early 2028 for bridge rehabilitation, according to the Ohio Department of Transportation.
During the closure, crews will make major repairs to extend the bridge's lifespan and improve safety, ODOT announced.
Read supporting passage
During the closure, ODOT says crews will make major repairs to the bridge to extend its lifespan and improve safety.
The project includes replacing the bridge's driving surface, upgrading components that support the structure, and strengthening the bridge piers.
Read supporting passage
The work will include replacing the bridge's driving surface, upgrading components that support the structure and strengthening the bridge piers.
According to ODOT, the bridge was originally constructed in 1963 and last received minor rehabilitation work in 1993.
Read supporting passage
According to ODOT, the bridge was originally constructed in 1963. It last received minor rehabilitation work in 1993.
Northbound drivers are directed along a detour following Winchester Pike to James Road, then connecting to westbound Interstate 70 toward Livingston Avenue and U.S. 33.
Read supporting passage
—Northbound detour: Winchester Pike to James Rd. to I-70 westbound to Livingston Ave./U.S. 33
Southbound traffic is advised to detour from U.S. 33 to State Route 104 and Refugee Road before returning to Winchester Pike.
Read supporting passage
—Southbound detour: U.S. 33 to SR 104/Refugee Rd. to Winchester Pike
WINCHESTER PIKE · northbound · work zone
Supporting evidence (4)
State transportation records schedule a closure starting Friday, Nov. 20, 2026, with the roadway slated to remain shut through early 2028.
Read supporting passage
Winchester Pike over U.S. 33 will close starting Friday, November 20 through early 2028.
State work-zone records indicate that the closure spans a 0.581-mile roadway segment with all lanes closed to vehicle traffic.
Read supporting passage
length_miles":0.581,"type":"LineString"}, Roads=WINCHESTER PIKE, Start verified=No, Starts=2026-11-20T05:00:00Z, Vehicle impact=all lanes closed
Traffic feed entries record the scheduled start on Nov. 20, 2026, while classifying the start date as unverified without real-time physical confirmation.
Read supporting passage
Start verified=No, Starts=2026-11-20T05:00:00Z
The Winchester Pike entry lists an end date of Jan. 15, 2028, with end verification marked 'No'.
Read supporting passage
End verified=No, Ends=2028-01-15T04:59:00Z, Geometry={"centroid":[-82.92056,39.92224],"first":[-82.91759,39.91887],"last":[-82.92344,39.92595],"length_miles":0.581,"type":"LineString"}, Roads=WINCHESTER PIKE