Video 0:28

Video

Columbus planners back 420 apartments at former Fort Rapids waterpark

Published

Read the full article

City planners generally support redeveloping the Fort Rapids waterpark site into 420 apartments, but are requiring traffic and sidewalk studies, parking layout changes, and compliance before upcoming rezoning takes effect.

How we know this

The sources and records behind this story, with the facts they support.

  1. Page 1

    ca.columbus.gov

    Accessed

    Supporting evidence (4)
    • City staff reviewed a council variance application for an apartment complex at 4560 Hilton Corporate Drive on Nov. 13 and issued considerations resulting from the review in a letter dated Nov. 25.

      Read supporting passage
      November 25, 2026 APPLICATION: CV26-113 Location: 4560 HILTON CORPORATE DR. (43232), being 16.59± acres located on the north side of Hilton Corporate Drive, at the terminus of Cloverleaf Street (010-118862; Greater South East Area Commission). Existing Zoning: L-M, Limited Manufacturing District and C-4, Commercial District. Proposed Use: Apartment complex. Applicant(s): Roers Acquisitions; c/o Matthew Hamby, Agent; Atwell Inc.; 6001 East Royalton Road, Suite 140; Broadview Heights, OH 44147. Property Owner(s): New Perspective Asset Management, LLC; c/o Dana Milligan; 3171 West Olympic Boulevard, #143, Los Angeles, CA 90006. Planner: Alyssa Saltzman; 614-645-9625; ADSaltzman@columbus.gov Dear Mr. Hamby, City staff reviewed the above referenced Council Variance application on Friday, November 13, 2026, and the following considerations are a result of the review:
    • Zoning staff in the Department of Building and Zoning Services commented that the proposed variance should indicate standard required setbacks and what they are being reduced to, while advising that a parking setback variance should be included because the western manufacturing district requires a 25-foot setback from the public street right-of-way.

      Read supporting passage
      Department of Building and Zoning Services, Zoning Staff has the following comments: 1. The proposed variance to setbacks should indicate what the required setbacks would normally be based on the limitation texts and base zoning district standards, and what they are being reduced to. 2. A parking setback variance request should be included for the development as proposed, due to the western L-M district (Z87-1496) requiring a minimum 25 foot setback from the public street right-of-way.
    • Staff also noted that the site is slated to be rezoned to Community Activity Center under Zone-In Phase 2, warning that a final site compliance plan must be submitted before that ordinance's effective date for the project to be reviewed under current zoning rules.

      Read supporting passage
      4. Please note, this site is slated to be rezoned to the CAC, Community Activity Center District as part of Zone-In Phase 2. In order for this proposal to be reviewed under Title 33, regardless of whether you ordinance has been approved at Council or not, you must have a Final Site Compliance Plan submitted to the Department of Building Zoning Services prior to the effective date of the Zone-In Phase 2 ordinance.
    • In addition, staff instructed the applicant to provide a completed recommendation form from the Greater South East Area Commission when finalized, and to notify the commission if any changes occur to the proposal.

      Read supporting passage
      3. Provide standardized recommendation form from the Greater South East Area Commission when finalized. *Be advised that if changes occur to the proposal after the commission makes a recommendation, it is the applicant’s responsibility to notify the commission of the changes
  2. Plan Calls for Replacing Former Fort Rapids Waterpark With 420 Apartments

    Published · Accessed

    Supporting evidence (2)
    • The proposal seeks to replace the former Fort Rapids Indoor Waterpark Resort with 420 apartments.

      Read supporting passage
      The 16.59-acre site at 4560 Hilton Corporate Drive, where the Fort Rapids Indoor Waterpark Resort is located, is proposed for redevelopment with a 420-unit apartment complex.
    • Previously, Pique reported plans for the project on Oct. 29, 2026.

      Read supporting passage
      Plan Calls for Replacing Former Fort Rapids Waterpark With 420 Apartments
  3. Page 2

    ca.columbus.gov

    Accessed

    Supporting evidence (6)
    • The city's Planning Division expressed general support for the requested variances, noting that multifamily residential use matches the Mixed Use 2 designation established under the Columbus Growth Strategy, which took effect on Feb. 25, 2026.

      Read supporting passage
      Planning is generally supportive of the requested variances, but request additional information, site plan revisions, elevations to review, and mature tree preservation. Staff note the proposed use is consistent with the Columbus Growth Strategy (CGS) recommended land use, Mixed Use 2.
    • However, planners requested reorienting Building C so that its parking lot is placed behind the building, citing design guidelines that recommend parking be hidden from view to the greatest extent possible.

      Read supporting passage
      CGS Mixed Use design guidelines recommend parking lots should be placed to the rear or side of a building and be hidden from view to the greatest extent possible (p.49). As such, Staff request reorienting Building C so that the parking lot is placed behind the building.
    • Planners also requested architectural building elevations and confirmation on whether existing perimeter fencing will remain, while calling for additional trees and landscaping around a planned stormwater basin and preservation of mature trees near the southwest parking lot.

      Read supporting passage
      Additionally, staff note landscaping at the existing stormwater retention ponds and therefore request additional landscaping/trees at the proposed stormwater pond in front of Building C. Staff also request mature tree preservation, where possible, at the fire turn around and parking area located at the southwest corner of the site.
    • The Department of Public Service's Division of Traffic Management stated that a traffic impact study will be required, noting that additional access revisions or commitments may be needed based on the study's results.

      Read supporting passage
      Department of Public Service, Division of Traffic Management has the following comments: 1. A traffic impact study will be required in conjunction with this application. Additional commitments or access revisions may be needed based on the results of the approved traffic impact study.
    • Traffic officials noted that a sidewalk will be required along the Hilton Corporate Drive frontage and sidewalk connections must be provided between each proposed building and the adjacent public sidewalk network.

      Read supporting passage
      2. With the proposed building construction, sidewalk will be required to be constructed along the Hilton Corporate Drive frontage of the site per the Department of Public Service Sidewalk and Shared Use Path Requirements Rules and Regulations. 3. Sidewalk connections will need to be provided between each proposed building and the public sidewalk network adjacent to the site per CCC 3312.41.
    • City code also requires an offsite sidewalk connection to existing walkways along South Hamilton Road and two COTA bus stops, with officials recommending the developer study an alignment along Hilton Corporate Drive, an emergency connector, and the Interstate 70 eastbound ramp in coordination with the Ohio Department of Transportation.

      Read supporting passage
      4. Per CCC 4309.08 offside sidewalk will need to be provided between the site to connect to existing sidewalk along South Hamilton Road and COTA Bus Stops #3932 and #3907. It is suggested to investigate the feasibility of addressing this requirement by providing sidewalk along the north side of Hilton Corporate Drive west of the site, the west side of the emergency-only connector between Hilton Corporate Drive and the I-70 Eastbound entrance ramp, and the south side of the I-70 eastbound entrance ramp to South Hamilton Road. If this alignment is determined to be geometrically feasible, further coordination would be needed with the Ohio Department of Transportation.
  4. Page 3

    ca.columbus.gov

    Accessed

    Supporting evidence (2)
    • The city's Planning Division expressed general support for the requested variances, noting that multifamily residential use matches the Mixed Use 2 designation established under the Columbus Growth Strategy, which took effect on Feb. 25, 2026.

      Read supporting passage
      2. Staff note that the land use recommendation was recently updated to Mixed Use 2 as a result of the passage of Columbus Growth Strategy (CGS), which is consistent with the request. That legislation took effect on Wednesday, February 25th, 2026.
    • Planners also requested architectural building elevations and confirmation on whether existing perimeter fencing will remain, while calling for additional trees and landscaping around a planned stormwater basin and preservation of mature trees near the southwest parking lot.

      Read supporting passage
      Staff request confirmation as to whether the existing fencing surrounding the property is to remain or be replaced/removed. Lastly, staff request elevations to review for consistency with CGS design guidelines.
  5. CV26-113 · Council Variance — 4560 HILTON CORPORATE DR COLUMBUS OH

    City of Columbus · Accela Citizen Access

    Published · Accessed

  6. Page 1

    ca.columbus.gov

    Accessed

  7. Page 5

    ca.columbus.gov

    Accessed

  8. Page 11

    ca.columbus.gov

    Accessed

Take Pique with you

Your city. In your pocket.

Read local stories, watch the videos and explore the details in Pique.

QR code for Pique Media on the App Store

Get Pique for iPhone and iPad

Scan the code with your phone’s camera.

View on the App Store

Share this story