Development Development & real estate

Staff Report Outlines 25-Story Estrella Tower Plans Ahead of Downtown Commission Review

Ahead of Tuesday's Downtown Commission review, plans outline the demolition of existing structures for the 25-story Estrella tower at 199 E. Rich St.

Downtown

Watch the video

A staff report released on Thursday, Oct. 22, outlines plans to construct The Estrella, a 25-story mixed-use tower at 199 E. Rich St. For the property at 199 E. Rich St., the applicant is seeking conceptual feedback from the commission on Tuesday, Oct. 27, 2026. The site is comprised of six parcels bounded by South Fourth Street to the west, East Rich Street to the north, South Young Street to the east, and East Cherry Street to the south, containing nine structures built between 1900 and 1940. The applicant is seeking conceptual feedback from the commission to demolish the nine existing structures and construct The Estrella. Of those nine buildings, eight are potentially contributing structures. Three parcels containing two-story and three-story structures from 1900 and 1910 are not part of the development proposal and will remain standing.

Architectural rendering of The Estrella, showing a multi-story dark masonry podium and white high-rise residential tower in downtown Columbus.

An architectural rendering depicts The Estrella, a proposed 25-story tower featuring a dark masonry podium and upper residential floors at East Rich and South Fourth streets.

Credit: Berardi+ Partners / Bluestone Brothers via Columbus Underground · Illustration Image source

Illustrative rendering

Demolition standards and replacement review

The application was previously heard in February 2025, when the Downtown Commission decided to continue the demolition request until a replacement structure was approved. Under Downtown District Code 3359, no permit for demolition in the downtown district shall be granted without commission approval via a Certificate of Appropriateness, and no certificate will be issued unless a replacement use has been reviewed and approved. To approve the demolition, the commission must determine whether the proposal allows for new development that is of greater significance to the character of the surrounding area than the existing structures. While acknowledging that downtown design guidelines support larger scale buildings to maximize investment potential, staff noted that guidelines equally encourage the preservation of existing buildings.

Staff feedback on blank walls

Planning staff determined that the proposed high-rise meets general guidelines, but encouraged the applicant to pursue a more creative treatment for the blank wall along the Cherry Street frontage. Guidelines recommend that parking structures exclude blank walls adjacent to the public right-of-way, while staff comments rated the exterior edge not consistent due to a blank wall on N 4th. City guidelines encourage developers to incorporate public art to enliven blank building walls along street elevations.

Updated project program

The updated application details an increase in housing capacity, proposing 296 residences on floors 8 through 24 alongside seven penthouses on the 25th floor. Automobile parking has been increased to 327 access-controlled spaces, including 26 spaces designated for visitors. Floors 2 through 5 will house garage spaces and resident services, while the sixth floor will feature an outdoor pool plaza for residents alongside indoor fitness, meeting, and co-working spaces along its east and west perimeters.

A principal residential lobby is planned at the north edge of the building, with service areas facing south to Cherry Street and garage access on the east. Guidelines state that a COA should be issued for the proposed replacement use or building prior to issuance of the demolition permit.

Video Watch video 0:40

More on this story

Pique’s reporting on the same events, newest first.

  1. Downtown Latest

    City Staff Report Schedules 25-Story Estrella Tower for Downtown Commission Action

    Staff rated the parking garage not consistent due to a blank wall on North Fourth Street and noted the Downtown Commission must determine the demolition request.

  2. Downtown

    Certificate of Appropriateness Filed for 25-Story Estrella Tower at 199 E. Rich St.

    A Certificate of Appropriateness application was submitted for The Estrella, a proposed 25-story mixed-use tower at 199 E. Rich St.

  3. Downtown

    Downtown Commission Takes No Action on 25-Story Estrella Tower Proposal

    A conceptual review of The Estrella leaves design and demolition approvals pending under downtown zoning rules.

  4. Downtown You are reading

    Staff Report Outlines 25-Story Estrella Tower Plans Ahead of Downtown Commission Review

How we know this

The sources and records behind this story, with the facts they support.

  1. COA2601058 · Certificate of Approval/Appropriateness — 199 E RICH ST

    City of Columbus · Accela Citizen Access

    Accessed

    Supporting evidence (1)
    • A staff report released on Thursday, Oct. 22, outlines plans to construct The Estrella, a 25-story mixed-use tower at 199 E. Rich St.

      Read supporting passage
      199 E Rich Street 25-Story Mixed-Use Tower See project brief within cumulative conceptual architectural set for detailed description. Document: Applicant Submitted Materials · 20260930_Estrella CDC Concept Submission_Updated.pdf · attachment 5384537 · 2026-09-30T00:00:00Z · 18.12 MB Document: Applicant Submitted Materials · 20260930_Estrella CDC Concept Submission.pdf · attachment 5384539 · 2026-09-30T00:00:00Z · 17.71 MB Document: Staff Report · V. DC October 2026_Staff Reports.pdf · attachment 5424948 · 2026-10-22T00:00:00Z · 296.73 KB
  2. Page 12

    ca.columbus.gov

    Accessed

    Supporting evidence (14)
    • A staff report released on Thursday, Oct. 22, outlines plans to construct The Estrella, a 25-story mixed-use tower at 199 E. Rich St.

      Read supporting passage
      Address: 199 E Rich St. Owner/Applicant: Rico 199 LLC (owner) / Berardi + Partners (applicant) Project Request: Conceptual Project Classification: Demolition; New Construction Work Description: New Construction of 25-story Mixed-Use Tower Proposed Work Description: The site is comprised of 6 parcels bounded by S. Fourth Street to the west, E. Rich Street to the north, S. Young St. to the east, and E. Cherry St. to the south. The site contains 9 structures built between 1900 and 1940, of which 8 are potentially contributing. Three parcels containing two, 2 and 3-story structures from 1900 and 1910 are not a part of the development proposal and will remain. The applicant is seeking conceptual feedback from the Commission to demolish the 9 existing structures and construct a mixed-use development named The Estrella.
    • For the property at 199 E. Rich St., the applicant is seeking conceptual feedback from the commission on Tuesday, Oct. 27, 2026.

      Read supporting passage
      Downtown Commission October 27, 2026 Page 12 of 16 Application: COA2601058 Address: 199 E Rich St. Owner/Applicant: Rico 199 LLC (owner) / Berardi + Partners (applicant) Project Request: Conceptual Project Classification: Demolition; New Construction Work Description: New Construction of 25-story Mixed-Use Tower Proposed Work Description: The site is comprised of 6 parcels bounded by S. Fourth Street to the west, E. Rich Street to the north, S. Young St. to the east, and E. Cherry St. to the south. The site contains 9 structures built between 1900 and 1940, of which 8 are potentially contributing. Three parcels containing two, 2 and 3-story structures from 1900 and 1910 are not a part of the development proposal and will remain. The applicant is seeking conceptual feedback from the Commission to demolish the 9 existing structures and construct a mixed-use development named The Estrella.
    • The site is comprised of six parcels bounded by South Fourth Street to the west, East Rich Street to the north, South Young Street to the east, and East Cherry Street to the south, containing nine structures built between 1900 and 1940.

      Read supporting passage
      The site is comprised of 6 parcels bounded by S. Fourth Street to the west, E. Rich Street to the north, S. Young St. to the east, and E. Cherry St. to the south. The site contains 9 structures built between 1900 and 1940, of which 8 are potentially contributing.
    • The applicant is seeking conceptual feedback from the commission to demolish the nine existing structures and construct The Estrella.

      Read supporting passage
      The applicant is seeking conceptual feedback from the Commission to demolish the 9 existing structures and construct a mixed-use development named The Estrella.
    • Of those nine buildings, eight are potentially contributing structures.

      Read supporting passage
      The site contains 9 structures built between 1900 and 1940, of which 8 are potentially contributing.
    • Three parcels containing two-story and three-story structures from 1900 and 1910 are not part of the development proposal and will remain standing.

      Read supporting passage
      Three parcels containing two, 2 and 3-story structures from 1900 and 1910 are not a part of the development proposal and will remain.
    • The application was previously heard in February 2025, when the Downtown Commission decided to continue the demolition request until a replacement structure was approved.

      Read supporting passage
      The application was last seen at the February 2025 meeting where the commission decided to continue the demolition until a replacement structure was approved.
    • While acknowledging that downtown design guidelines support larger scale buildings to maximize investment potential, staff noted that guidelines equally encourage the preservation of existing buildings.

      Read supporting passage
      The Downtown Design Guidelines recognize that Downtown is home to the region’s most intense development, where larger scale buildings are appropriate. Maximizing the investment potential of a given site is encouraged, but so is preservation of existing building stock.
    • Planning staff determined that the proposed high-rise meets general guidelines, but encouraged the applicant to pursue a more creative treatment for the blank wall along the Cherry Street frontage.

      Read supporting passage
      The proposed building generally meets the recommendations of the Downtown Design Guidelines. Staff encourage the applicant to consider a more creative treatment of the blank wall along the E.
    • Guidelines recommend that parking structures exclude blank walls adjacent to the public right-of-way, while staff comments rated the exterior edge not consistent due to a blank wall on N 4th.

      Read supporting passage
      Further the Guidelines recommend a high level of design for front-facing facades, lighting that minimizes light spill, first-floor transparency, high quality, durable materials such as traditional masonry, art to enliven blank walls, and parking structures that have a high level of architectural detail and exclude blank walls adjacent to the public right-of-way.
    • The updated application details an increase in housing capacity, proposing 296 residences on floors 8 through 24 alongside seven penthouses on the 25th floor.

      Read supporting passage
      • An increase of residential units from 277 to 296, including 1-BR and 2-BR dwellings, located on floors 8-24. 7 Penthouse units will be located on the 25th floor.
    • Automobile parking has been increased to 327 access-controlled spaces, including 26 spaces designated for visitors.

      Read supporting passage
      • Parking has been increased from 322 to 327 access-controlled including 26 spaces for visitors.
    • Floors 2 through 5 will house garage spaces and resident services, while the sixth floor will feature an outdoor pool plaza for residents alongside indoor fitness, meeting, and co-working spaces along its east and west perimeters.

      Read supporting passage
      • Floors 2-5 will occupy garage spaces and resident services while the 6th Floor will now contain a rooftop plaza with a pool for residents. The east and west edges of the 6th floor will be developed as interior spaces to accommodate fitness, meeting, and co-working spaces.
    • A principal residential lobby is planned at the north edge of the building, with service areas facing south to Cherry Street and garage access on the east.

      Read supporting passage
      • A principal Residential Lobby is currently planned at the north edge of the building. The south plan portion of The Estrella Tower facing south to Cherry Street will be relegated to services, with the east plan portion including garage access.
  3. Page 13

    ca.columbus.gov

    Accessed

    Supporting evidence (4)
    • Under Downtown District Code 3359, no permit for demolition in the downtown district shall be granted without commission approval via a Certificate of Appropriateness, and no certificate will be issued unless a replacement use has been reviewed and approved.

      Read supporting passage
      Downtown District Code- 3359 Downtown District Zoning Code Standards: Except in cases of public emergency as determined by the city's chief building official or by court order, no permit for the demolition of a structure in the downtown district shall be granted without the approval of the commission via a certificate of appropriateness. No certificate of appropriateness will be issued unless: Standard Staff Comments A replacement use has been reviewed and approved by the downtown commission, and historic resources commission if applicable; or
    • To approve the demolition, the commission must determine whether the proposal allows for new development that is of greater significance to the character of the surrounding area than the existing structures.

      Read supporting passage
      In regard to the proposed demolition, the Commission will need to determine if the proposal allows for new development, which in their opinion is of greater significance to the character of the surrounding area.
    • Planning staff determined that the proposed high-rise meets general guidelines, but encouraged the applicant to pursue a more creative treatment for the blank wall along the Cherry Street frontage.

      Read supporting passage
      Cherry frontage. In regard to the proposed demolition, the Commission will need to determine if the proposal allows for new development, which in their opinion is of greater significance to the character of the surrounding area.
    • Guidelines state that a COA should be issued for the proposed replacement use or building prior to issuance of the demolition permit.

      Read supporting passage
      A replacement use/building has been reviewed and approved by the Downtown Commission, and Historic Resources Commission, if applicable. Such review can occur concurrently with the COA application for a demolition. However, a COA should be issued for the proposed replacement use/building prior to issuance of the demolition permit.
  4. Page 14

    ca.columbus.gov

    Accessed

    Supporting evidence (2)
    • Guidelines recommend that parking structures exclude blank walls adjacent to the public right-of-way, while staff comments rated the exterior edge not consistent due to a blank wall on N 4th.

      Read supporting passage
      • Where parking structures and pedestrian areas adjoin, the exterior edge of the parking structure should exhibit a high level of architectural detail. Consistent. Semi-consistent- blank wall along N 4th. Not consistent- blank wall on N 4th.
    • City guidelines encourage developers to incorporate public art to enliven blank building walls along street elevations.

      Read supporting passage
      • The use of art is encouraged to enliven blank building walls along street elevations. Consistent
  5. COA2601058 · Certificate of Approval/Appropriateness — 199 E RICH ST

    City of Columbus · Accela Citizen Access

    Published · Accessed

  6. https://columbusunderground.com/proposed-tower-grows-to-24-stories-dirty-franks-building-to-remain-bw1/

    columbusunderground.com

    Accessed

Take Pique with you

Your city. In your pocket.

Read local stories, watch the videos and explore the details in Pique.

QR code for Pique Media on the App Store

Get Pique for iPhone and iPad

Scan the code with your phone’s camera.

View on the App Store

Share this story