Video Watch video 0:42
Updated Plans Submitted for 'Ghosthaus' Pocket Park at 195 S. Washington Ave.
Blostein/Overly Architects submitted continuation materials to replace a deteriorated Downtown building with a parkscape garden.
Architects proposing the demolition and replacement of the structure at 195 S. Washington Ave. with a parkscape garden have returned with additional details including a full landscaping and lighting plan. Applicant Bart Overly of Blostein/Overly Architects filed the Certificate of Appropriateness continuation application on Nov. 16, followed by revised applicant materials submitted Nov. 17.
The initial Certificate of Appropriateness application received a city status of conceptual review with no action on Sept. 30. Previously, Pique Media reported plans for the project: "Blostein Overly Architects Proposes Ghosthaus Pocket Park at 195 S. Washington Ave."
A conceptual rendering submitted to the City of Columbus depicts the proposed Ghosthaus pocket park garden at 195 S. Washington Ave.
Credit: Blostein/Overly Architects · Supplied image Image source
Titled Ghosthaus, the proposal envisions an adaptive site reuse reconfiguring the house into a garden. Project drawings describe plans to unfold the walls onto the building footprint. Site plans state that the garden will consist of reclaimed, landscape and construction elements. The design calls for reclaimed brick pavers with inset low-maintenance plantings, river rock tracing the original foundation, and a low concrete windowseat wall marking the corner.
The brick building sits in the corner of a surface parking lot a block south of the Topiary Park and has been boarded up for years, according to Columbus Underground. Both the building and the surrounding parking lot are owned by an LLC associated with Healthcare Realty Trust, a Nashville-based real estate investment trust that owns several nearby properties along East Main Street. Earlier this year, the commission denied an initial demolition request that simply called for extending the parking lot, citing guidelines that discourage tearing down buildings without an approved plan in place to replace them.
Under city preservation rules, property owners must obtain commission approval for Downtown demolitions unless the city declares a structure an immediate safety hazard. In application filings, the architects stated that the house has deteriorated beyond viable renovation, with the adjacent parking lot already encroaching on the parcel. The updated proposal aims to reclaim the portion of the site lost to the surface parking lot.
Pique’s reporting on the same events, newest first.
Downtown Latest You are reading
Updated Plans Submitted for 'Ghosthaus' Pocket Park at 195 S. Washington Ave.
Downtown
Blostein Overly Architects Proposes Ghosthaus Pocket Park at 195 S. Washington Ave.
A Certificate of Appropriateness filing calls for a 'Remolition' converting a deteriorated house into an adaptive site reuse garden.
How we know this
The sources and records behind this story, with the facts they support.
COA2601235 · Certificate of Approval/Appropriateness — 195 S WASHINGTON AVE
Supporting evidence (2)
Architects proposing the demolition and replacement of the structure at 195 S. Washington Ave. with a parkscape garden have returned with additional details including a full landscaping and lighting plan.
Read supporting passage
195 S Washington Avenue Demolition and replacement with parkscape garden A continuation of discussion of GHOSTHAUS, a three dimensional landscape element which will replace the existing structure. We return with additional details, a full landscaping and lighting plan, proposed materials and signage.
Applicant Bart Overly of Blostein/Overly Architects filed the Certificate of Appropriateness continuation application on Nov. 16, followed by revised applicant materials submitted Nov. 17.
Read supporting passage
Document: Applicant Submitted Materials · GHOSTHAUS_2026_1115.pdf · attachment 5471942 · 2026-11-17T00:00:00Z · 4.77 MB {Address=195 S WASHINGTON AVE, Applicant=Bart Overly; Blostein/Overly Architects
Central Ohio development applications (dataset query)
Supporting evidence (4)
Applicant Bart Overly of Blostein/Overly Architects filed the Certificate of Appropriateness continuation application on Nov. 16, followed by revised applicant materials submitted Nov. 17.
Read supporting passage
record_no: COA2601235; record_type: Certificate of Approval/Appropriateness; address: 195 S WASHINGTON AVE; filed: 2026-11-16; text: 195 S Washington Avenue Demolition and replacement with parkscape garden A continuation of discussion of GHOSTHAUS, a three dimensional landscape element which will replace the existing structure. We return with additional details, a full landscaping and lighting plan, proposed materials and signage.; link: https://ca.columbus.gov/permits/Cap/GlobalSearchResults.aspx?QueryText=COA2601235
The initial Certificate of Appropriateness application received a city status of conceptual review with no action on Sept. 30.
Read supporting passage
record_no: COA2601052; record_type: Certificate of Approval/Appropriateness; status: Conceptual Review - No Action; address: 195 S WASHINGTON AVE; filed: 2026-09-30; text: 195 S Washington Avenue Demolition and replacement with parkscape garden The existing structure occupies a corner site adjacent to a surface parking lot in the downtown. Its condition — both exterior and interior — has deteriorated beyond the point of economically or commercially viable renovation, and a portion of the site has already been encroached upon by the adjacent parking lot. Rather than a straightforward demolition, we propose a "Remolition": a reconfiguration of the house and a reimagining of the site's memory, resulting in a small public garden built from materials and fragments of the existing structure. The garden will reclaim the portion of the site currently lost to the surface parking lot, incorporating salvaged wall brick as paving material, as shown conceptually in the accompanying materials. Landscaping will consist of low-maintenance ornamental grasses and ground cover, with further design development to follow for vertical elements and landscape lighting.; link: https://ca.columbus.gov/permits/Cap/GlobalSearchResults.aspx?QueryText=COA2601052
In application filings, the architects stated that the house has deteriorated beyond viable renovation, with the adjacent parking lot already encroaching on the parcel.
Read supporting passage
record_no: COA2601052; record_type: Certificate of Approval/Appropriateness; status: Conceptual Review - No Action; address: 195 S WASHINGTON AVE; filed: 2026-09-30; text: 195 S Washington Avenue Demolition and replacement with parkscape garden The existing structure occupies a corner site adjacent to a surface parking lot in the downtown. Its condition — both exterior and interior — has deteriorated beyond the point of economically or commercially viable renovation, and a portion of the site has already been encroached upon by the adjacent parking lot. Rather than a straightforward demolition, we propose a "Remolition": a reconfiguration of the house and a reimagining of the site's memory, resulting in a small public garden built from materials and fragments of the existing structure. The garden will reclaim the portion of the site currently lost to the surface parking lot, incorporating salvaged wall brick as paving material, as shown conceptually in the accompanying materials. Landscaping will consist of low-maintenance ornamental grasses and ground cover, with further design development to follow for vertical elements and landscape lighting.; link: https://ca.columbus.gov/permits/Cap/GlobalSearchResults.aspx?QueryText=COA2601052
The updated proposal aims to reclaim the portion of the site lost to the surface parking lot.
Read supporting passage
record_no: COA2601052; record_type: Certificate of Approval/Appropriateness; status: Conceptual Review - No Action; address: 195 S WASHINGTON AVE; filed: 2026-09-30; text: 195 S Washington Avenue Demolition and replacement with parkscape garden The existing structure occupies a corner site adjacent to a surface parking lot in the downtown. Its condition — both exterior and interior — has deteriorated beyond the point of economically or commercially viable renovation, and a portion of the site has already been encroached upon by the adjacent parking lot. Rather than a straightforward demolition, we propose a "Remolition": a reconfiguration of the house and a reimagining of the site's memory, resulting in a small public garden built from materials and fragments of the existing structure. The garden will reclaim the portion of the site currently lost to the surface parking lot, incorporating salvaged wall brick as paving material, as shown conceptually in the accompanying materials. Landscaping will consist of low-maintenance ornamental grasses and ground cover, with further design development to follow for vertical elements and landscape lighting.; link: https://ca.columbus.gov/permits/Cap/GlobalSearchResults.aspx?QueryText=COA2601052
Blostein Overly Architects Proposes Ghosthaus Pocket Park at 195 S. Washington Ave.
Supporting evidence (1)
Previously, Pique Media reported plans for the project: "Blostein Overly Architects Proposes Ghosthaus Pocket Park at 195 S. Washington Ave."
Read supporting passage
Blostein Overly Architects Proposes Ghosthaus Pocket Park at 195 S. Washington Ave.
Supporting evidence (1)
Titled Ghosthaus, the proposal envisions an adaptive site reuse reconfiguring the house into a garden.
Read supporting passage
GHOSTHAUS ADAPTIVE SITE REUSE IN DOWNTOWN COLUMBUS REMOLITION: TO RECONFIGURE THE MEMORY OF THE SITE AND PUT IT TO NEW USE: HOUSE BECOMES GARDEN
Supporting evidence (1)
Project drawings describe plans to unfold the walls onto the building footprint.
Read supporting passage
UNFOLD THE WALLS ONTO THE BUILDING FOOTPRINT
Supporting evidence (2)
Site plans state that the garden will consist of reclaimed, landscape and construction elements.
Read supporting passage
50% RECLAIMED MATERIAL 45% LANDSCAPE MATERIAL 5% CONSTRUCTION ELEMENTS
The design calls for reclaimed brick pavers with inset low-maintenance plantings, river rock tracing the original foundation, and a low concrete windowseat wall marking the corner.
Read supporting passage
WINDOWSEAT WALL LOW CONCRETE ELEMENT MARKING THE CORNER RECLAIMED BRICK PAVERS WITH INSET LOW MAINTENENCE PLANTINGS RIVER ROCK MARKING THE HOUSE’S ORIGINAL FOOTPRINT
Supporting evidence (6)
The brick building sits in the corner of a surface parking lot a block south of the Topiary Park and has been boarded up for years, according to Columbus Underground.
Read supporting passage
The brick building proposed for demolition sits in the corner of a surface parking lot a block south of the Topiary Park
The brick building sits in the corner of a surface parking lot a block south of the Topiary Park and has been boarded up for years, according to Columbus Underground.
Read supporting passage
The building sits in the corner of an existing surface parking lot and has been boarded up for years.
Both the building and the surrounding parking lot are owned by an LLC associated with Healthcare Realty Trust, a Nashville-based real estate investment trust that owns several nearby properties along East Main Street.
Read supporting passage
Both the building and the surrounding parking lot are owned by an LLC associated with Healthcare Realty Trust, a Nashville-based REIT that owns several other properties in the immediate vicinity, including the multi-story buildings at 500 and 515 E. Main St.
Earlier this year, the commission denied an initial demolition request that simply called for extending the parking lot, citing guidelines that discourage tearing down buildings without an approved plan in place to replace them.
Read supporting passage
The commission denied the initial demolition request earlier this year, citing its guidelines, which strongly discourage tearing buildings down without an approved plan in place to replace them.
Earlier this year, the commission denied an initial demolition request that simply called for extending the parking lot, citing guidelines that discourage tearing down buildings without an approved plan in place to replace them.
Read supporting passage
The plan presented in February simply called for extending the parking lot, which both the City of Columbus and the Downtown Commission view as a land use that should be discouraged in the central business district.
Under city preservation rules, property owners must obtain commission approval for Downtown demolitions unless the city declares a structure an immediate safety hazard.
Read supporting passage
For Downtown projects, the commission must sign off on any demolition requests unless the building has been deemed an immediate safety hazard by the city