Video 0:34

Video

Blostein Overly Architects Proposes Ghosthaus Pocket Park at 195 S. Washington Ave.

Published

Updated

Read the full article

A Certificate of Appropriateness filing calls for a 'Remolition' converting a deteriorated house into an adaptive site reuse garden.

How we know this

The sources and records behind this story, with the facts they support.

  1. COA2601052 · Certificate of Approval/Appropriateness — 195 S WASHINGTON AVE

    City of Columbus · Accela Citizen Access

    Published · Accessed

    Supporting evidence (3)
    • On Sept. 30, 2026, Bart Overly of Blostein/Overly Architects submitted an application for a Certificate of Appropriateness proposing to demolish a deteriorated residential building at 195 S.

      Read supporting passage
      195 S Washington Avenue Demolition and replacement with parkscape garden
    • In application materials, the applicant stated that the house has deteriorated beyond the point of economically or commercially viable renovation and that the neighboring parking lot has encroached upon the parcel.

      Read supporting passage
      deteriorated beyond the point of economically or commercially viable renovation, and a portion of the site has already been encroached upon by the adjacent parking lot.
    • The application is currently in progress awaiting staff review and historic commission consideration.

      Read supporting passage
      Status=In Progress
  2. Page 3

    ca.columbus.gov

    Accessed

    Supporting evidence (1)
    • Rather than carrying out a conventional teardown, the firm proposed what it terms a "Remolition," aiming to reconfigure the memory of the site and unfold the walls onto the building footprint to create a public garden.

      Read supporting passage
      TO RECONFIGURE THE MEMORY OF THE SITE AND PUT IT TO NEW USE: HOUSE BECOMES GARDEN
  3. Page 4

    ca.columbus.gov

    Accessed

    Supporting evidence (1)
    • Rather than carrying out a conventional teardown, the firm proposed what it terms a "Remolition," aiming to reconfigure the memory of the site and unfold the walls onto the building footprint to create a public garden.

      Read supporting passage
      UNFOLD THE WALLS ONTO THE BUILDING FOOTPRINT
  4. Page 8

    ca.columbus.gov

    Accessed

    Supporting evidence (1)
    • According to site plans, the proposed garden composition consists of 50 percent reclaimed material, 45 percent landscape material, and 5 percent construction elements.

      Read supporting passage
      50% RECLAIMED MATERIAL 45% LANDSCAPE MATERIAL 5% CONSTRUCTION ELEMENTS
  5. Page 2

    ca.columbus.gov

    Accessed

    Supporting evidence (1)
    • The filing frames the teardown as the removal of a historic structure in poor condition and of non-contributing use.

      Read supporting passage
      REMOVAL OF A HISTORIC STRUCTURE IN POOR CONDITION AND OF NON- CONTRIBUTING USE

Take Pique with you

Your city. In your pocket.

Read local stories, watch the videos and explore the details in Pique.

QR code for Pique Media on the App Store

Get Pique for iPhone and iPad

Scan the code with your phone’s camera.

View on the App Store